This is the public record of what was published, and of what the later checks observed. It is not an endorsement of Richard Foord or of the text. If something here is wrong, send a correction. A reply is a suggestion. It does not edit this page, the April 2025 scrape, or the audit.
The record
URLs from the April 2025 scrape, checked again on 7 September 2026.
April site text compared with the 21 September 2026 homepage fetch of https://www.richardfoord.org.uk.0 sentences still present, 1608 not found, 18 new.The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
The snapshot lists 5 of 1608 sentences that were not found. The rest are counted, not quoted here.
Before · April 2025
Foord calls on Government to stop ‘shifting the goalposts’ on flood support Richard Foord MP has urged the Government to set out criteria for when the Flood Recovery Framework would be activated to help with the aftermath of flooding, after Ministers refused to in the wake of flooding along the Rive
Gap: no replacement sentence is matched. The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
Before · April 2025
Foord: Conservatives are letting South West Water off the hook Liberal Democrat MP, Richard Foord, has responded to the news that South West Water chose to ferry millions of litres of waste to a pumping station near Exmouth beach, despite knowing it would cause raw sewage to be spilled into the sea.
Gap: no replacement sentence is matched. The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
Before · April 2025
Several other notable sites include the overflow at Salcombe Regis, which saw 223 spills lasting 4,827 hours, the sewage treatment works in Honiton, which experienced 148 spills into the River Otter for more than 1,061 hours, and the overflow in Kilmington, which discharged into the River Axe for 1,
Gap: no replacement sentence is matched. The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
Before · April 2025
‘Neighbourhood health centres’ must feature Eastern Devon’s community hospitals Five community hospitals across the Honiton & Sidmouth constituency There are five community hospitals across the Honiton & Sidmouth constituency at: Axminster, Honiton, Ottery St Mary, Seaton and Sidmouth, running a ran
Gap: no replacement sentence is matched. The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
Before · April 2025
Neighbourhood Health Centres funding set to be announced as part of the Budget Health Secretary Wes Streeting’s neighbourhood health centre proposal is part of the Government’s new 10-year plan for the NHS and recommends that GPs, district nurses, care workers and other medical professionals are bas
Gap: no replacement sentence is matched. The April text covers the whole scraped site; the later text is one homepage fetch. A sentence can be missing from that homepage and still exist on another page.
New on the later homepage, not matched to a removed sentence
Honiton, Sidmouth and Tiverton Liberal Democrats Skip to main content Honiton, Sidmouth and Tiverton Liberal Democrats Meet Richard Campaigns News Get in touch Volunteer Donate Join Donate Join Campaigns Rural Broadband Rollout Stop Sewage Dumping Flood defences Save Seaton Hospital Fix NHS Dentistrdefencenhs This sentence is only on the later homepage. No April sentence is matched to it. 21 September 2026 · https://www.richardfoord.org.uk
About me My record of service Learn about me View My campaigns What I'm fighting for Find out more View News & Updates What I've been up to Get the latest news View Latest news Richard Foord Devon MP condemns rural banking "heist", as Honiton counts down to losing its last bank Rural towns across De This sentence is only on the later homepage. No April sentence is matched to it. 21 September 2026 · https://www.richardfoord.org.uk
CW by Claire Wright 17 Aug 2026 View Richard Foord Devon MP challenges ministers on “loose change” fines for water company pollution Richard Foord MP has demanded to know why the region’s water company is subject to fines years after sewage dumping offences – and why those fines are small enough for This sentence is only on the later homepage. No April sentence is matched to it. 21 September 2026 · https://www.richardfoord.org.uk
CW by Claire Wright 10 Jun 2026 View Richard Foord Devon MP challenges ministers on “loose change” fines for water company pollution Richard Foord MP has demanded to know why the region’s water company is subject to fines years after sewage dumping offences – and why those fines are small enough for This sentence is only on the later homepage. No April sentence is matched to it. 21 September 2026 · https://www.richardfoord.org.uk
WF by William Farmer 2 Sep 2026 View Richard Foord Investment in the Exeter to London Waterloo railway line is now urgent, says Devon MP The long-neglected West of England line must go to the front of the queue for urgent investment in the face of climate change, a Devon MP has demanded.climatetransport This sentence is only on the later homepage. No April sentence is matched to it. 21 September 2026 · https://www.richardfoord.org.uk
Reply if this is wrong
Corrections today go to the project tracker. The link opens a GitHub issue with this record filled in. There is no login on Civicord, no review queue on this site, and no email is sent.